阿摩線上測驗
登入
首頁
> 最新資料
最新資料
瀏覽最新的試卷、試題和詳解,掌握最新考試資訊
最新科目
教育學程◆教育基本知識
技檢◆農業機械修護-乙級
預官 - 憲法與立國精神
最新試卷
115年 - 115 公共工程品管人員(機電班)題庫 1951-2000#139510(50題)
115年 - 115 公共工程品管人員(機電班)題庫 1851-1900#139509(50題)
115年 - 115 公共工程品管人員(機電班)題庫 1751-1800#139508(50題)
115年 - 115 公共工程品管人員(機電班)題庫 1651-1700#139507(50題)
115年 - 115 公共工程品管人員(機電班)題庫 1551-1600#139506(50題)
115年 - 115 公共工程品管人員(機電班)題庫 1451-1500#139505(50題)
115年 - 115公共工程品管人員(機電班)題庫 1351-1400#139504(50題)
115年 - 115 公共工程品管人員(機電班)題庫 1251-1300#139503(50題)
115年 - 115 公共工程品管人員(機電班)題庫 1051-1100#139502(50題)
115年 - 115 公共工程品管人員(機電班)題庫 951-1000#139501(50題)
最新試題
50. What is the key message conveyed in the final paragraph of the text? (A). The most effective way to combat online racism is to avoid engaging in online discussions altogether. (B) Online racism is not an inevitable part of online communication and cannot be completely eradicated. (C) Everyone has a role to play in addressing online racism and creating a more inclusive environment. (D) Combating online racism is solely the responsibility of universities and online platform administrators.
49. Based on the passage, which bar chart best matches the description of the results from the study on interventions promoting bystander response to online racism? (A) (B) (C) (D)
48. What was the purpose of the full intervention used in the study? (A) To provide emotional support to only Black students facing online racism (B) To educate faculty members on dealing with racism in the classrooms (C) To offer Black students tools for managing their emotional well-being (D) To guide White students on how to effectively respond to racist comments
最新申論題
Q2. In which cases shall the engineer in charge of the watch notify the Chief Engineer immediately?A: In the following cases:1. When engine damage or a malfunction occurs, which may endanger the safe operation of the ship.2. When any malfunction occurs which, it is believed, may cause damage or break down of propulsion machinery, auxiliary machinery or monitoring and governing systems.3. In any emergency if in any doubt as to what decision on measure to take.
Q1: When you take over a ship, how do you activate the plant systems?A: In all case the cold ship starting procedures must be coordinated by the chief engineer or a nominated deputy officer. Desirably, the check-off lists should be used to identify the actions required when starting the plant systems and components.1.Starting conditionsAfter a prolonged shutdown of plant, or when work has been carried out by repairers, an extensive check needs to be made on all systems for cleanliness and valve settings. All machinery units which have been opened up must be thoroughly examined before closure. Rotating machines should be barred round and electric motors megger tested before starting. Standard safety precautions must be observed at all times. It is to be understood throughout that alarms and safety devices should be proven as each unit and system is commissioned.1. Diesel generator systemsThe emergency diesel generator should be tested, stopped and left in an immediately stand-by conditions, and the 24V battery supply system for alarms and emergency lighting must be available, one of the diesel generator should be started. After a main set has been put on load the feeder breakers to auxiliary motors should be seen to be closed and a check made that auxiliary machinery, previously supplied from shore power, has restarted. Therefore, the principle ship and hotel services may be activated, e.g. sea water and sanitary, fire and wash deck, potable water, and control air supply (where fitted).
四、請將下列對話翻譯成中文(20%)Dialogue 2 Taking over the main engineA: Mr. James, I'd like to know something about main engine.B: Generally speaking, it's runs well.A: Have you done some repair work on it?B: Yes, we have.A: What kind of repairs?B: We change one cylinder liner.A: Which one?B: No.6 cylinder.A: Why did you renew it?B: Because it was cracked.A: Have you kept all the repair lists and records?B: Sorry, some of them are missing, but you can check it in the engine logbook.A: By the way, what kind of fuel oil do you use?B: We use IF380cSt fuel oilA: What's the daily consumption?B: About 40 tons.Dialogue 2 Confirm the preparationB: Have all of the order stores been brought on board?A: Yes, the ship chandler sent them yesterday.B: How much fuel oil is reserved on board?A: About 400 tonsB: What is daily consumption?A: 50 tonsB: Do you think we need any lube oil supply?A: No, I don't think so. But we need 20 kg R134aB: Ok. I'll ask the agent to do it as quickly as possible.
最新課程
國三下英文課程(九年級)
講師:
台中大雅家教-睿智數學及英文家教,王瑞志老師
簡介:
提供國三下英文單字口訣記憶課程,諧音記憶法,老師嚴選測驗題,透過遊戲+影音+講義+測驗,多環相扣的方式...
國中英語基礎文法(上)
講師:
Brenda
簡介:
結合國中會考基測常考單字及文法題庫,共18單元以循序漸進方式安排解題與老師解說,幫助同學理解每一單元的...
高一上英文課程(十年級)
講師:
台中大雅家教-睿智數學及英文家教,王瑞志老師
簡介:
老師嚴選高中英文課程單字,遊戲+講義+影音+測驗......等,多效合一。
最新主題筆記
1-3 公告與領標:法定程序與常見地雷區
課程:
公職人員採購法理論與實務-從招標、決標到履約管理,建立採購作業的系統化防錯地圖
章節:
第一章:招標啟動與準備
描述:
解析公開招標、選擇性招標等不同方式的公告規定與實務操作陷阱,確保程序百分百合法。
2-2 評選實戰:最有利標評審會議如何主導?
課程:
公職人員採購法理論與實務-從招標、決標到履約管理,建立採購作業的系統化防錯地圖
章節:
第二章:決標策略與程序
描述:
從成立評選委員會、訂定評審標準到撰寫評審報告,掌握讓評選結果公正、可防禦的關鍵技巧。
2-3 決標與通知:完成採購的臨門一腳
課程:
公職人員採購法理論與實務-從招標、決標到履約管理,建立採購作業的系統化防錯地圖
章節:
第二章:決標策略與程序
描述:
確認決標對象、發出決標公告與通知,並處理後續異議與申訴的起手式,完美收尾決標階段。
最新討論
2.在滅火四種方法中,下列那一種為去除連鎖反應之滅火方法?(A)冷卻法(B)抑制法(C)窒息法(D)隔離法。
32.下列何者不是DSM-5診斷性格疾患之準則中,所提及的自我與人際功能(self- and interpersonal functioning) 的向度之一? (A)同理心(empathy) (B)焦慮感(anxiety) (C)自我認同(identity) (D)自我引導的能力(self-direction)
複選題101. 下列哪些屬於建築之弱電設備? (A)電話設備 (B)自動火警探測設備 (C)電器時鐘設備 (D)低瓦數照明設備 。
(一)計算甲公司 X1 年應資本化之借款金額。 (6 分)
(二)若甲公司 X2 年 7 月 1 日因颱風無法施工,暫停建造廠房 2 個月 (廠房仍於 X2 年 10 月 1 日完工),試算 X2 年應資本化之借款金 額。 (8 分)
(三)若甲公司使用直線法提列廠房之折舊費用,廠房耐用年數 15 年,殘值為$28,000,計算 X2 年應認列之折舊費用金額。 (6 分)