阿摩線上測驗 登入

最新科目

最新試卷

115年 - 115 國家安全情報特種考試_三等_國際組(選試英文):國際經濟學(含國際經貿組織)#140886(4題)

115年 - 115 一般警察特種考試_二等_刑事警察人員犯罪分析組:計算機數學(包括離散數學、機率與統計)#140885(11題)

115年 - 115 一般警察特種考試_二等_刑事警察人員犯罪分析組:資料探勘技術(包括資料庫管理與運用、線上交易處理【OLTP】、資料倉儲【DataWarehouse】、資料探勘【DataMining】)#140884(6題)

115年 - 115 一般警察特種考試_二等_刑事警察人員犯罪分析組:數位訊號處理(DSP)#140883(9題)

115年 - 115 高級中等以下學校及幼兒園教師資格考試_特殊教育學校(班):學習者發展與適性輔導#140882(34題)

115年 - 115年度高級中等以下學校及幼兒園教師資格考試-課程教學與評量#140881(31題)

115年 - 115 一般警察特種考試_三等_消防警察人員:分析化學(含儀器分析)#140880(17題)

115年 - 115 一般警察特種考試_四等_行政警察人員、水上警察人員輪機組、水上警察人員航海組:英文#140879(50題)

115年 - 115 一般警察特種考試_四等_行政警察人員:警察法規概要(包括警察法、行政執行法、社會秩序維護法、警械使用條例、集會遊行法、警察職權行使法、行政程序法、公務人員行政中立法)#140878(27題)

115年 - 115 一般警察特種考試_二等_刑事警察人員電子監察組:通訊概論#140877(13題)

最新試題

最新申論題

Q2. In which cases shall the engineer in charge of the watch notify the Chief Engineer immediately?A: In the following cases:1. When engine damage or a malfunction occurs, which may endanger the safe operation of the ship.2. When any malfunction occurs which, it is believed, may cause damage or break down of propulsion machinery, auxiliary machinery or monitoring and governing systems.3. In any emergency if in any doubt as to what decision on measure to take.

Q1: When you take over a ship, how do you activate the plant systems?A: In all case the cold ship starting procedures must be coordinated by the chief engineer or a nominated deputy officer. Desirably, the check-off lists should be used to identify the actions required when starting the plant systems and components.1.Starting conditionsAfter a prolonged shutdown of plant, or when work has been carried out by repairers, an extensive check needs to be made on all systems for cleanliness and valve settings. All machinery units which have been opened up must be thoroughly examined before closure. Rotating machines should be barred round and electric motors megger tested before starting. Standard safety precautions must be observed at all times. It is to be understood throughout that alarms and safety devices should be proven as each unit and system is commissioned.1. Diesel generator systemsThe emergency diesel generator should be tested, stopped and left in an immediately stand-by conditions, and the 24V battery supply system for alarms and emergency lighting must be available, one of the diesel generator should be started. After a main set has been put on load the feeder breakers to auxiliary motors should be seen to be closed and a check made that auxiliary machinery, previously supplied from shore power, has restarted. Therefore, the principle ship and hotel services may be activated, e.g. sea water and sanitary, fire and wash deck, potable water, and control air supply (where fitted).

四、請將下列對話翻譯成中文(20%)Dialogue 2 Taking over the main engineA: Mr. James, I'd like to know something about main engine.B: Generally speaking, it's runs well.A: Have you done some repair work on it?B: Yes, we have.A: What kind of repairs?B: We change one cylinder liner.A: Which one?B: No.6 cylinder.A: Why did you renew it?B: Because it was cracked.A: Have you kept all the repair lists and records?B: Sorry, some of them are missing, but you can check it in the engine logbook.A: By the way, what kind of fuel oil do you use?B: We use IF380cSt fuel oilA: What's the daily consumption?B: About 40 tons.Dialogue 2 Confirm the preparationB: Have all of the order stores been brought on board?A: Yes, the ship chandler sent them yesterday.B: How much fuel oil is reserved on board?A: About 400 tonsB: What is daily consumption?A: 50 tonsB: Do you think we need any lube oil supply?A: No, I don't think so. But we need 20 kg R134aB: Ok. I'll ask the agent to do it as quickly as possible.

最新課程

最新主題筆記

最新討論